Sistering floor joists
A common problem in older buildings is that floors sag or feel ‘springy’ (that is they 'bounce' when walked on). This can be because the joists are undersized (particularly where older buildings are converted for modern uses where they may be subject to higher loads than was originally intended), or they have been weakened by decay or by having holes or notches cut through them incorrectly. The structural repair of damaged floor joists is known as ‘sistering’.
Floor joists can become damaged due to contact with water which may lead to rot setting in or infestation from termites, woodworm, and so on. These underlying problems should be rectified first before sistering, or the damage will recur.
The typical choice for sistering material is framing timer or engineered timber products such as plywood.
The first step to take is to remove any obstructions, such as electrical cables, pipes, and so on. If this is too difficult the new joists can be notched, although this may mean that are not as strong. The new joists are set alongside the existing ones. Joist material should be chosen that matches the height of what is already installed, as well as being, as closely as possible, the same span.
If necessary, a hydraulic jack and post can be used to jack up the joists until they are level. It is sometimes recommended that jacks are only raised by around 1/8 inch per day to avoid cracking in the walls and floors.
Adhesive should be applied along the length of a joist to strengthen the bond between the existing and its sister, as well as to prevent squeaking. Quick clamps are used to hold the sistered joist in place, and nails driven through the sister and into the existing joist. Shifting and settling can work to loosen and separate the boards over time, therefore, the nails should be used with lag or carriage bolts to lock them together.
The quick clamps can then be released. This process should then be repeated for each joist that needs strengthening or straightening.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Quality Planning for Micro and Small to Medium Sized Enterprises
A CIOB Academy Technical Information sheet.
A briefing on fall protection systems for designers
A legal requirement and an ethical must.
CIOB Ireland launches manifesto for 2024 General Election
A vision for a sustainable, high-quality built environment that benefits all members of society.
Local leaders gain new powers to support local high streets
High Street Rental Auctions to be introduced from December.
Infrastructure sector posts second gain for October
With a boost for housebuilder and commercial developer contract awards.
Sustainable construction design teams survey
Shaping the Future of Sustainable Design: Your Voice Matters.
COP29; impacts of construction and updates
Amid criticism, open letters and calls for reform.
The properties of conservation rooflights
Things to consider when choosing the right product.
Adapting to meet changing needs.
London Build: A festival of construction
Co-located with the London Build Fire & Security Expo.
Tasked with locating groups of 10,000 homes with opportunity.
Delivering radical reform in the UK energy market
What are the benefits, barriers and underlying principles.
Information Management Initiative IMI
Building sector-transforming capabilities in emerging technologies.
Recent study of UK households reveals chilling home truths
Poor insulation, EPC knowledge and lack of understanding as to what retrofit might offer.
Embodied Carbon in the Built Environment
Overview, regulations, detail calculations and much more.
Why the construction sector must embrace workplace mental health support
Let’s talk; more importantly now, than ever.
Ensuring the trustworthiness of AI systems
A key growth area, including impacts for construction.