Sistering floor joists
A common problem in older buildings is that floors sag or feel ‘springy’ (that is they 'bounce' when walked on). This can be because the joists are undersized (particularly where older buildings are converted for modern uses where they may be subject to higher loads than was originally intended), or they have been weakened by decay or by having holes or notches cut through them incorrectly. The structural repair of damaged floor joists is known as ‘sistering’.
Floor joists can become damaged due to contact with water which may lead to rot setting in or infestation from termites, woodworm, and so on. These underlying problems should be rectified first before sistering, or the damage will recur.
The typical choice for sistering material is framing timer or engineered timber products such as plywood.
The first step to take is to remove any obstructions, such as electrical cables, pipes, and so on. If this is too difficult the new joists can be notched, although this may mean that are not as strong. The new joists are set alongside the existing ones. Joist material should be chosen that matches the height of what is already installed, as well as being, as closely as possible, the same span.
If necessary, a hydraulic jack and post can be used to jack up the joists until they are level. It is sometimes recommended that jacks are only raised by around 1/8 inch per day to avoid cracking in the walls and floors.
Adhesive should be applied along the length of a joist to strengthen the bond between the existing and its sister, as well as to prevent squeaking. Quick clamps are used to hold the sistered joist in place, and nails driven through the sister and into the existing joist. Shifting and settling can work to loosen and separate the boards over time, therefore, the nails should be used with lag or carriage bolts to lock them together.
The quick clamps can then be released. This process should then be repeated for each joist that needs strengthening or straightening.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Reasons for using MVHR systems
6 reasons for a whole-house approach to ventilation.
Supplementary Planning Documents, a reminder
As used by the City of London to introduce a Retrofit first policy.
The what, how, why and when of deposit return schemes
Circular economy steps for plastic bottles and cans in England and Northern Ireland draws.
Join forces and share Building Safety knowledge in 2025
Why and how to contribute to the Building Safety Wiki.
Reporting on Payment Practices and Performance Regs
Approved amendment coming into effect 1 March 2025.
A new CIOB TIS on discharging CDM 2015 duties
Practical steps that can be undertaken in the Management of Contractors to discharge the relevant CDM 2015 duties.
Planning for homes by transport hubs
Next steps for infrastructure following the updated NPPF.
Access, history and Ty unnos.
The world’s first publicly funded civic park.
Exploring permitted development rights for change of use
Discussing lesser known classes M, N, P, PA and L.
CIOB Art of Building 2024 judges choice winner
Once Upon a Pass by Liam Man.
CIOB Art of Building 2024 public choice winner
Fresco School by Roman Robroek.
HE expands finance alliance to boost SME house building
Project follows on from Habiko public-private place making pension partnership for affordable housing delivery.
Licensing construction; looking back to look forward
Voluntary to required contractors (licensing) schemes.
A contractor discusses the Building Safety Act
A brief to the point look at changes that have occurred.
How orchards can influence planning and development.